Using Federated BIM to Coordinate Deep Excavations
The case demonstrates that temporary works can be treated as an integrated part of digital coordination.
Construction analytics
Read spotlightRESEARCH SPOTLIGHT · 2021
Reliable field records can support both engineering decisions and procedural fairness after a disaster.
Large reconstruction programs generate enormous volumes of damage information, and incomplete records can amplify disputes. The study examined Nepal’s first use of a digitized assessment application after the 2015 Gorkha earthquake.
Reconstruction engineers reported their experience with the application used during the detailed assessment of more than one million buildings. The analysis compared conditions across 31 affected districts and documented lessons for reconstruction and data management.
Reliable field records can support both engineering decisions and procedural fairness after a disaster. The case shows why data design should be treated as part of reconstruction governance, not merely as administrative support. Read together, the question, method, and findings show how this publication fits within Tafazzoli’s broader program of connecting built-environment evidence with practical decisions. The page intentionally separates documented results from interpretation and directs readers to the complete paper for methodological detail. The study also illustrates a recurring principle across this research portfolio: a useful result must be understood in its original setting before it is transferred to another project, organization, population, or policy context.
Digitized reconstruction evidence. This original synthesis graphic is based on the study’s documented question, method, or principal contribution; consult the paper for complete figures, labels, units, and uncertainty.
Original website synthesis based on the cited publication.
View full-size figure ↗READ THE PAPER
Published · 2021 · Journal article
Shrestha, K., Deshar, R., Kisi, K. P., & Tafazzoli, M. (2021). Data digitization to mitigate legal disputes during reconstruction in earthquake-prone areas. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(2), 05021001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000455
CONTINUE EXPLORING
The case demonstrates that temporary works can be treated as an integrated part of digital coordination.
Construction analytics
Read spotlightThe method gives teams a defensible way to discuss contingency, contracts, and mitigation before uncertainty becomes a claim.
Construction analytics
Read spotlightThe work demonstrates why a single cash-flow curve can be misleading.
Construction analytics
Read spotlight