Using Federated BIM to Coordinate Deep Excavations
The case demonstrates that temporary works can be treated as an integrated part of digital coordination.
Construction analytics
Read spotlightRESEARCH SPOTLIGHT · 2019
For researchers, the work provides a documented basis for the next study of construction analytics.
This project examines construction analytics and the practical problem identified in the paper’s title. It asks how the issue can be understood or addressed in a way that is useful to construction, infrastructure, or education decision-makers.
The paper developed or evaluated a structured analytical approach for construction analytics. The study connects the inputs and comparisons described in the publication with an interpretable decision process; readers should consult the linked paper for the complete dataset, assumptions, equations, and validation details.
For researchers, the work provides a documented basis for the next study of construction analytics. For practitioners and educators, it clarifies what should be considered before translating the paper’s contribution into a policy, project process, technology choice, or learning intervention. Read together, the question, method, and findings show how this publication fits within Tafazzoli’s broader program of connecting built-environment evidence with practical decisions. The page intentionally separates documented results from interpretation and directs readers to the complete paper for methodological detail.
Fuzzy-based approach to predict the performance of shear connectors in composite. This original synthesis graphic is based on the study’s documented question, method, or principal contribution; consult the paper for complete figures, labels, units, and uncertainty.
Original website synthesis based on the cited publication.
View full-size figure ↗READ THE PAPER
Published · 2019 · Journal article
Kalantari, S. M., Mortazavi, S. M., & Tafazzoli, M.(2019). Fuzzy-based approach to predict the performance of shear connectors in composite structures. Journal of Soft Computing in Civil Engineering, 3(4), 1–11. https://doi.org/10.22115/SCCE.2020.215906.1165
CONTINUE EXPLORING
The case demonstrates that temporary works can be treated as an integrated part of digital coordination.
Construction analytics
Read spotlightThe method gives teams a defensible way to discuss contingency, contracts, and mitigation before uncertainty becomes a claim.
Construction analytics
Read spotlightThe work demonstrates why a single cash-flow curve can be misleading.
Construction analytics
Read spotlight